
Project
Details
To ensure uninterrupted flow of waste water and to provide an efficient central collection point for a new subdivision, we installed a Sewage Lifting Station. This project also included an emergency generator, fuel tank, pumps, motors and controls, leak detection, SCADA, power distribution, lighting, heating and lightning protection.
Project
Pictures
Warning: is_file(): open_basedir restriction in effect. File(/wp-content/uploads/2013/08/Waste-Water-Treatment_Harrietsfield.jpg) is not within the allowed path(s): (/var/www/vhosts/tjelectric.ca/:/tmp/) in /var/www/vhosts/tjelectric.ca/httpdocs/wp-includes/class-wp-image-editor-imagick.php on line 131
Warning: is_file(): open_basedir restriction in effect. File(/wp-content/uploads/2013/08/Waste-Water-Treatment_Harrietsfield_Nova-Scotia-2.jpg) is not within the allowed path(s): (/var/www/vhosts/tjelectric.ca/:/tmp/) in /var/www/vhosts/tjelectric.ca/httpdocs/wp-includes/class-wp-image-editor-imagick.php on line 131
Warning: is_file(): open_basedir restriction in effect. File(/wp-content/uploads/2013/08/Sewage-Lifting-Stationt_Harrietsfield.jpg) is not within the allowed path(s): (/var/www/vhosts/tjelectric.ca/:/tmp/) in /var/www/vhosts/tjelectric.ca/httpdocs/wp-includes/class-wp-image-editor-imagick.php on line 131
Warning: is_file(): open_basedir restriction in effect. File(/wp-content/uploads/2013/08/Waste-Water-Treatment_Harrietsfield_Nova-Scotia-3.jpg) is not within the allowed path(s): (/var/www/vhosts/tjelectric.ca/:/tmp/) in /var/www/vhosts/tjelectric.ca/httpdocs/wp-includes/class-wp-image-editor-imagick.php on line 131