Project
Details
The provincial power utility needed mission-critical upgrading at one of three combustion turbines that provide a secondary source of power generation. We replaced 6 fuel tanks including pumps, motors, controls, the emergency stop system and leak detection at the Tusket 24 megawatt turbine plant, while keeping the site operational throughout the project.